LOCATION: Blue River, Wisconsin | CAPACITY: 26.24KW | COMPLETION DATE: June 2024
SOLAR CONTRACTOR:
In 2024, Legacy Solar Co-op worked with Eagle Point Solar to install a 26.24kW rooftop solar array at Capri Cheese in Blue River, WI. The array is estimated to offset about 96% of their electricity annually.